| |
|
|
|
|
| S. SUKTO AND P. CHARNSETHIKUL : List-scheduling
and column-generations
for scheduling of n
job-groups with set
up time and due date
through m identical
parallel machines to
minimize makespan |
|
511–535 |
Abstracts |
Full Text |
| |
|
|
|
|
| M. F. YANG : A two-echelon inventory model with
fuzzy annual demand
in a supply chain |
|
537–550 |
Abstracts |
Full Text |
| |
|
|
|
|
| C. H. CHENG AND P. J. CHENG : Genetic algorithm
based wavelet neural
network speed controller
for spindle motor of
DVD-ROM |
|
551–563 |
Abstracts |
Full Text |
| |
|
|
|
|
| S.W. CHIU : Effect of repair cost on the rework
decision - making in
an economic production
quantity model |
|
565–576 |
Abstracts |
Full Text |
| |
|
|
|
|
| C. K. SUNG AND C. Y. LIN : Optimizing an integrated
production and quality
strategy considering
inspection and preventive
maintenance errors |
|
577–593 |
Abstracts |
Full Text |
| |
|
|
|
|
| J. H. LIN, R. JOU AND C. P. CHANG : Optimal lending
under strategic acquisition
and capital regulation:
an option-based optimization |
|
595–614 |
Abstracts |
Full Text |
| |
|
|
|
|
| Y. T. CHANG, C. Y. LO, P. C. CHEN AND Y. K. HUANG
: The application of
neural networks and
grey system theory in
foreign exchange rates
forecasting |
|
615–628 |
Abstracts |
Full Text |
| |
|
|
|
|
| C. Y. LIN : Factors affecting the innovation in
logistics information
systems for logistics
service providers in
Taiwan |
|
629–648 |
Abstracts |
Full Text |
| |
|
|
|
|
| L. H. CHEN AND Y. J. CHENG : Assessing the performance
of various evaluation
periods between the
market model and the
grey model in relation
to event study
|
|
649–663 |
Abstracts |
Full Text |
| |
|
|
|
|
| S. H. CHANG AND S. H. PAO : Quantity discount strategies
and returns policies
|
|
665–678 |
Abstracts |
Full Text |
| |
|
|
|
|
| W. Y. WANG, D. J. HORNG AND Y. C. CHEN : Optimal
production and inspection
strategy while considering
preventive maintenance
errors and minimal repair |
|
679–694 |
Abstracts |
Full Text |
| |
|
|
|
|
| Y. F. HUANG AND M. L. SHYU : On a finite production
model with random defective
rate and shortages allowed
and backordered |
|
695–699 |
Abstracts |
Full Text |
| |
|
|
|
|
| J. C. KE, C. H. LIOU AND S. L. LEE : An optimum
maintenance strategy
for machine repair problem
with spares and server
vacations |
|
701–722 |
Abstracts |
Full Text |
| |
|
|
|
|
| C. W. CHANG, C. R. WU AND H. L. LIN : A simplified
measurement scheme for
software quality |
|
723–732 |
Abstracts |
Full Text |
| |
|
|
|
|
| C. C. TSAI AND C. C. CHEN : Measuring process capability
index Cpk with fuzzy
data |
|
733–746 |
Abstracts |
Full Text |
| |
|
|
|
|
| B. C. OUYANG AND H. RAU : A simple optimal approach
for the inventory replenishment
problem with linear
demand |
|
747–755 |
Abstracts |
Full Text |
| |
|
|
|
|
| Index of Volume 27 (2006) |
|
757–759 |
Abstracts |
Full Text |
| |
|
|
|
|
Published by
TARU
PUBLICATIONS, NEW DELHI |
|
|
|
|